INTERIOR WORK
Exterior work is finished. The solar collectors are mounted, the pump station is installed.
We are still working at the interior work. We started downstairs in the cellar with the ceiling, then we laid the insulation layer down on it from the ground floor, then the floor itself. After that we mounted the ceiling of the ground floor. At the end we laid the insulation layer down on it from the first floor, then the floor itself.
These pictures show how it looks like.
Our living room from an other angle
Here is where we eat every day
The cellar ceiling is made of Troldtekt acoustic panels
The kitchen floor is insulated with 2 layers of rockwool
The kitchen floor consists of plates of plywood which are covered with tiles
The special ceiling on the ground floor is looking like an open daisy from beneath here
The ventilation in the ground floor
It was quite a work to finish this side of the house, where the old part is meeting the new one