EXTERIOR WORK

 

The walls are built. The roof is on. The basic construction started on february 22, 2009 and was finished at the end of august 2009, i.e. 6 months.

Autumn is here now and the house needs to be closed and protected against bad weather.

Windows and doors have to be inserted.

Both parts of the house (new + old) have to be connected, so the new extension looks like a natural part of the whole house.

Solar panels and photovoltage cells have to be mounted to provide warm water for shower and air heating.

 

Windows and terrace door are inserted

Old and new roof are matching each other

6 horizontal solar collectors are hanging on the east and west wall

These pictures are the most significative snapshots taken during this step of construction